Green Marine Engineering Materials and Solutions Provider

Home / Shuangdun Fish Harbor Marine Aquaculture Protection Case

Shuangdun Fish Harbor Marine Aquaculture Protection Case

HOKBG Silt Curtain

2022

Marine aquaculture protection

2023

2025

Project images use satellite maps (images taken from Google Earth)

Case Study of Marine Aquaculture Protection in the Shuangdun Fishing Port Project

Project Overview

The Shuangdun Fishing Port Project is located in Bailong Village, Jiangshan Town, Fangcheng District, Fangchenggang City, Guangxi Province. The first phase of the project—channel dredging and terminal upgrading—covers a land area of 4,198 mu and a sea area of 1,883 mu. The main wharf line extends approximately 989.6 meters with an entrance channel width of 60 meters.
The project aims to revitalize the marine economy, improve the port’s fishing capacity, and enhance the ecological environment surrounding the aquaculture zones. With a total investment of about 300 million RMB, it includes the construction of 13 berths for 200 HP fishing vessels and 2 berths for 600 HP vessels, achieving an annual unloading capacity of 40,000 tons.

Project Timeline

  • Project planning initiated: 2022
  • Construction started: March 2023
  • Phase I completion and acceptance: July 2025

Project Contractor

  • Owner: Fangchenggang Culture & Tourism Group Co., Ltd.
  • Contractor: CCCC Second Harbour Engineering Co., Ltd.
  • Material Supplier & Technical Support: HOKBG® (Haokang Ecological Materials Co., Ltd.)

Photo Source:HOKBG

Technical Scheme

The Shuangdun Fishing Port project is located in a densely cultivated marine aquaculture area, surrounded by numerous fish cages, oyster rafts, and seaweed farms. To minimize the environmental impact of dredging and reclamation activities, the project implemented the integral permeable anti-pollution curtain system designed by HOKBG®. Main technical measures include:

  • Integral permeable silt curtains with floatation, curtain fabric, and anchoring systems
  • Permeable curtain design: The curtain extends from the sea surface to 4m underwater, isolating the pollution source while maintaining water flow.
  • Installation and maintenance guidance for coastal and nearshore operations

HOKBG Supply Scope

HOKBG provided full sets of marine environmental protection materials and technical services, including:

  • Integral permeable silt curtains with floatation, curtain fabric, and anchoring systems
  • Real-time Monitoring: Continuous monitoring of temperature, salinity, and turbidity ensures the water environment meets marine organism growth standards.

Material properties
All materials were designed for high durability against UV exposure, seawater corrosion, and strong tidal conditions.

Photo Source: China Communications Construction Company official website

Project Achievement

The project achieved remarkable results in protecting the surrounding marine aquaculture ecosystems. The application of HOKBG’s anti-pollution curtains effectively reduced water turbidity, maintained high transparency, and protected the local fish, shellfish, and seaweed farms from contamination.
The project became a model of eco-friendly fishery port construction in Guangxi Province, balancing infrastructure development with marine environmental preservation, and supporting sustainable growth of the local fishing economy.

Disclaimer

All designs are based on our product parameters. Accidents caused by using other companies' products have nothing to do with us.

Please send your message to us
*Email
Name
*Tel
*Title
*Content
Upload
  • Only supports .rar/.zip/.jpg/.png/.gif/.doc/.xls/.pdf, maximum 20MB.

Other Case Recommendations

China Huanghua Port Project Case

The project covers a reclamation area of 2.06 km², with a total hydraulic fill volume of 11.41 million m³ and a soft soil treatment area of 2.15 million m².

Learn More

Saudi Arabia Jizan Project Case

Initiated in 2013, the Jazan Economic City (JEC) is a flagship development by the Saudi Arabian government. Located approximately 80 kilometers from Jazan city, the planned city spans 103 square kilometers with an 11-kilometer coastline and a total investment of USD 25 billion.

Learn More

Coral Reef Protection in Yangpu Harbor, China

The port will ultimately have a 44 km shoreline, 24 million m² of land area, and approximately 146 berths, with an annual throughput capacity projected to reach 225 million tons and 12 million TEUs by 2035.

Learn More

Case Study Of Jingu River Protection Project In Guangxi, China

The Guangxi Jingu River Channel Dredging Project is a major river regulation and environmental improvement project in Guangxi. Its primary mission is to remove silt, improve navigation conditions and expand the two-way navigation capacity from 50,000 tons to 100,000 tons.

Learn More

Saudi Arabian Oil Company Jizan Project Case

The project features the largest-diameter HDPE subsea pipeline installation in the world, with a total length of approximately 6,600 meters and a pipe diameter of 3.5 meters, capable of delivering 530 million liters of seawater per day.

Learn More

China Pinglu Canal Mangrove Protection Project

Built to Class I inland waterway standards and accommodating vessels up to 5,000 tonnes, it required nearly 400 million cubic meters of excavated earth and rock. Section HD15, located at the southernmost section of the canal's estuary, stretches approximately 22 kilometers.

Learn More