Case Study Of The Jingu River Waterway Dredging Project In Guangxi

Project Overview

The Guangxi Jingu River Channel Dredging Project is a major river regulation and environmental improvement project in Guangxi. Its primary mission is to remove silt, improve navigation conditions and expand the two-way navigation capacity from 50,000 tons to 100,000 tons. Located in southern China, the project balances ecological protection with waterway improvement, aiming to restore the river's natural hydrodynamics and achieve sustainable development for both shipping and the environment.

Project Timeline

Start Date: 2020
Completion Date: 2023

Project Contractor

The project is undertaken by CCCC Guangzhou Waterway Engineering Co., Ltd., a company that has long focused on water conservancy projects and ecological restoration and is a representative construction company in the region.

During The Project Construction

Photo Source: HOKBG

Technical Scheme

This project uses a cutter suction dredger and supporting vessels to remove silt from the main channel. In order to reduce secondary pollution and turbidity spread, anti-pollution curtains are installed at the mud discharge outlets, supplemented by geotextile enclosure measures. The silt dredged from the channel is then blown into the coastal cofferdam area, where it is treated as a soft soil foundation to create land for the dock.

HOKBG Supply Scope

HOKBG provided an anti-fouling curtain system for this project, supporting dredging and environmental protection work. The scope of supply included:

  • Integral silt curtain system with floats, curtain fabric and anchoring devices, totaling 11,000 m.Aging-resistant and salt-alkali-resistant integral cord fabric
  • On-site installation technical guidance

Test Report

Photo Source: HOKBG

Project Completed

Photo Source: HOKBG

Project Achievement

This dredging project effectively restored the waterway depth, improved shipping efficiency, ensured shipping safety and created new dock space. The application of the HOKBG anti-fouling curtain system effectively controlled sediment spread during construction, ensuring full compliance with environmental standards. The project successfully passed inspection and was recognized as a model case study in green dredging and sustainable waterway management in Guangxi.

Disclaimer

All designs are based on our product parameters. Accidents caused by using other companies' products have nothing to do with us.

Please send your message to us
*Email
Name
*Tel
*Title
*Content
Upload
  • Only supports .rar/.zip/.jpg/.png/.gif/.doc/.xls/.pdf, maximum 20MB.

Other Case Recommendations

China Huanghua Port Project Case

The project covers a reclamation area of 2.06 km², with a total hydraulic fill volume of 11.41 million m³ and a soft soil treatment area of 2.15 million m².

Learn More

Shuangdun Fish Harbor Marine Aquaculture Protection Case

The first phase of the project—channel dredging and terminal upgrading—covers a land area of 4,198 mu and a sea area of 1,883 mu. The main wharf line extends approximately 989.6 meters with an entrance channel width of 60 meters.

Learn More

Coral Reef Protection in Yangpu Harbor, China

The port will ultimately have a 44 km shoreline, 24 million m² of land area, and approximately 146 berths, with an annual throughput capacity projected to reach 225 million tons and 12 million TEUs by 2035.

Learn More

Saudi Arabia Jizan Project Case

Initiated in 2013, the Jazan Economic City (JEC) is a flagship development by the Saudi Arabian government. Located approximately 80 kilometers from Jazan city, the planned city spans 103 square kilometers with an 11-kilometer coastline and a total investment of USD 25 billion.

Learn More

Saudi Arabian Oil Company Jizan Project Case

The project features the largest-diameter HDPE subsea pipeline installation in the world, with a total length of approximately 6,600 meters and a pipe diameter of 3.5 meters, capable of delivering 530 million liters of seawater per day.

Learn More

China Pinglu Canal Mangrove Protection Project

Built to Class I inland waterway standards and accommodating vessels up to 5,000 tonnes, it required nearly 400 million cubic meters of excavated earth and rock. Section HD15, located at the southernmost section of the canal's estuary, stretches approximately 22 kilometers.

Learn More